FOR PRODUCTION MANAGERS

STOP MISSING YOUR PRODUCTION PLAN.

Build the planning, scheduling, and daily-control system you need to detect production gaps earlier, act faster, and hit your plan with greater consistency.

IMPLEMENTATION KIT

On-Time Production

The Implementation Kit to Hit Your Plan from Day One

Plan Capacity Before constraints become delays.
Build the Schedule Connect demand with execution.
Control Daily Performance Turn gaps into corrective action.
GET ON-TIME PRODUCTION

Ready-to-use production planning and control resources. Start implementing from Day One.

Practical Implementation System 34 Ready-to-Use Resources Designed for Immediate Execution

YOUR PRODUCTION PLAN SHOULD NOT DEPEND ON FIREFIGHTING EVERY DAY.

When capacity, scheduling, and daily execution are disconnected, production teams react too late. Gaps become delays, delays become missed targets, and managers spend the day explaining what already happened.

Capacity Gaps Appear Too Late

Production commitments can exceed available capacity, shifts, headcount, or resources before the constraint is visible.

The Schedule Stops Being Executable

Forecast, demand, inventory, supply, and production requirements drift apart, creating constant schedule changes and unstable priorities.

Actual vs Plan Is Managed After the Fact

Daily production gaps are identified at the end of the shift instead of being contained while there is still time to recover.

THERE IS A BETTER WAY

MOVE FROM REACTIVE PRODUCTION MANAGEMENT TO VISIBLE, CONNECTED CONTROL.

Instead of treating volume planning, scheduling, and shop-floor performance as separate activities, build one connected production control system that lets your team see gaps earlier and act before they become missed commitments.

01
Plan What the Operation Can Support Align expected volume with capacity, takt, shifts, headcount, and resources.
02
Build an Executable Production Schedule Connect demand, forecast, inventory, supply, and weekly production requirements.
03
Control Performance During the Day Track Actual vs Plan, detect deviations, escalate issues, and drive recovery action.
The goal is not more reporting. The goal is to create enough visibility and discipline to make better production decisions before the plan is lost.

ONE IMPLEMENTATION KIT. THREE LEVELS OF PRODUCTION CONTROL.

On-Time Production gives you a structured set of practical resources to plan production volume, build the Master Schedule, and control daily execution with greater visibility and discipline.

Plan Capacity Before It Becomes a Constraint Translate expected production volume into capacity, takt, shifts, headcount, and resource requirements.
Build a More Executable Production Schedule Connect forecast, demand, supply, projected inventory, and production commitments through MPS and ATP controls.
Control Actual vs Plan During the Day Detect production gaps earlier, escalate issues, and support faster recovery action on the shop floor.
34 Ready-to-Use Resources
3 Implementation Modules
10 Editable Excel Tools
3 Operational SOPs
MODULE 01

MTP Volume Plan

Build the medium-term production foundation needed to determine whether expected volume can be supported by available capacity and resources.

Inside This Module

  • Volume Plan / AOP
  • Demand vs Capacity / RCCP
  • Takt and Required Capacity
  • Resource Plan for shifts and headcount
  • Consolidated Manual
  • Professional Presentation
  • Exam
  • Practical Assignment
  • Executive Report
  • How-to Matrix
  • SOP-PRD-001 — Volume Plan Management
Implementation Outcome: Identify capacity and resource gaps before they affect execution.
MODULE 02

Master Schedule and Forecast

Transform forecast and demand information into a controlled weekly production schedule connected to inventory, supply, and production commitments.

Inside This Module

  • Forecast Management
  • Forecast Accuracy
  • Master Production Schedule / MPS
  • Projected Inventory
  • Safety Stock
  • Available-to-Promise / ATP
  • Consolidated Manual
  • Professional Presentation
  • Exam
  • Practical Assignment
  • Executive Report
  • How-to Matrix
  • SOP-PRD-002 — Forecast and Master Schedule Management
Implementation Outcome: Create a clearer connection between demand, supply, inventory, and the weekly production plan.
MODULE 03

Daily Production Performance

Take production control to the shop floor with a daily management system focused on Actual vs Plan, visibility, escalation, recovery, and continuous improvement.

Inside This Module

  • Hour-by-Hour Production Control
  • Actual vs Plan Monitoring
  • OEE
  • Production & OEE Board
  • 5S Audit
  • Kardex & ABC Cycle Counting
  • ILUO Matrix
  • Consolidated Manual
  • Professional Presentation
  • Exam
  • Practical Assignment
  • Executive Report
  • How-to Matrix
  • SOP-PRD-003 — Daily Production Performance Management
Implementation Outcome: Detect deviations earlier and support corrective action while there is still time to recover the plan.
COMPLETE IMPLEMENTATION RESOURCE SET

Everything is organized to help you learn, apply, standardize, and report.

10 Editable Excel Tools
3 Operational SOPs
3 Consolidated Manuals
3 Presentations
3 Exams
3 Practical Assignments
3 Executive Reports
3 How-to Matrices
1 Pack User Guide

START FASTER WITH TWO PRACTICAL IMPLEMENTATION BONUSES.

🎁 BONUS 01

Express Plan-Attainment Self-Assessment

A practical diagnostic resource designed to help you identify where production-plan attainment is being lost and where implementation should begin.

  • Evaluate production-control maturity
  • Identify operational gaps across the 3 modules
  • Review results and implementation prescription
  • Use the reference target to prioritize action
Benefit: Reduce implementation guesswork and focus first on the areas creating the greatest production-control gap.
🎁 BONUS 02

Formula Pocket Guide

A compact quick-reference resource for the key formulas and quantitative concepts used throughout production planning and control.

  • Quick operational reference
  • Supports planning calculations
  • Useful during analysis and implementation
  • Designed for planners, supervisors, and managers
Benefit: Apply production calculations faster without repeatedly searching through the complete training material.
GET THE COMPLETE IMPLEMENTATION KIT

On-Time Production

The Implementation Kit to Hit Your Plan from Day One

✓ 34 Ready-to-Use Resources ✓ 3 Complete Implementation Modules ✓ 10 Editable Excel Tools ✓ 3 Operational SOPs ✓ 2 Practical Bonuses
SPECIAL OFFER
$ 10 USD
GET ON-TIME PRODUCTION NOW

Get immediate access to the complete production planning and control implementation resource pack.

STOP REACTING TO PRODUCTION GAPS. START CONTROLLING THEM EARLIER.

Get the complete On-Time Production Implementation Kit and start connecting capacity, scheduling, and daily execution in one practical production control system.

SPECIAL OFFER
$ 10 USD
✓ 34 Ready-to-Use Resources ✓ 3 Implementation Modules ✓ 10 Editable Excel Tools ✓ 3 Operational SOPs ✓ 2 Practical Bonuses
GET ON-TIME PRODUCTION NOW

Immediate access to the complete implementation resource pack.

EVERYTHING YOU NEED TO KNOW BEFORE YOU START.

Who is On-Time Production designed for? +

On-Time Production is designed for Production Managers, Production Planners, Master Schedulers, Supervisors, Operations Managers, Manufacturing Managers, and production professionals responsible for capacity, scheduling, shop-floor control, and production-plan attainment.

Is this a course or an implementation kit? +

It is a practical implementation kit. It combines manuals, presentations, assessments, assignments, executive reports, How-to Matrices, editable Excel tools, and operational SOPs so you can learn the methodology and apply it directly to production planning and control.

What production areas does the kit cover? +

The kit covers three connected areas: MTP Volume Plan, Master Schedule and Forecast, and Daily Production Performance. Together, they connect medium-term planning, weekly scheduling, and daily shop-floor execution.

What editable tools are included? +

The pack includes 10 editable Excel tools covering Volume Plan, Demand vs Capacity, Takt and Required Capacity, Resource Planning, Master Production Scheduling, Demand vs Supply / ATP, Production & OEE, 5S, inventory and cycle counting, and ILUO workforce controls.

Do I need advanced production planning knowledge? +

No advanced software or programming knowledge is required. The resources are structured to support practical implementation through manuals, presentations, instructions, exercises, templates, SOPs, and How-to Matrices.

Can I use the kit if my production operation is already running? +

Yes. The system is useful both for teams that need to recover production-plan attainment and for operations that already have basic controls in place and want to improve planning, standardization, visibility, and daily execution.

Where should I start? +

Start with the Pack User Guide and the Express Plan-Attainment Self-Assessment. The assessment helps identify where production-control gaps are concentrated so you can prioritize the most relevant module and resources first.

What do I receive with the purchase? +

You receive the complete 34-resource On-Time Production pack: 3 implementation modules, 10 editable Excel tools, 3 operational SOPs, 3 manuals, 3 presentations, 3 exams, 3 assignments, 3 executive reports, 3 How-to Matrices, 1 Pack User Guide, plus 2 implementation bonuses.

YOUR PRODUCTION PLAN NEEDS A CONTROL SYSTEM BEHIND IT.

PLAN THE VOLUME. BUILD THE SCHEDULE. CONTROL DAILY EXECUTION.

Put the complete production planning and control system into action with On-Time Production.

ONLY TODAY $10 USD
YES — I WANT ON-TIME PRODUCTION
Secure Checkout Immediate Digital Access 34 Practical Resources